TF ModuleTF MODULE
RU
A two-storey modular hotel with balconies among a coniferous forestModular Hotels

Hospitality

Modular Hotels

Modular hotel projects with 8–10 rooms: factory production, ready-made rooms with bathrooms, optional northern and furniture packages, and delivery with technical documentation.

What a modular hotel is

A modular hotel is manufactured at the factory: the rooms, bathrooms, and building systems are prepared in advance, and on site the property is put together from finished blocks. Design takes 2–3 weeks, production of a complex takes up to 45 days, and pre-shipment preparation takes up to 30 days. For us, "turnkey" means full factory specification: the client's contractor handles on-site assembly.

Projects and floor plans

The catalog below has three projects: Hotel One — 10 rooms on 240 m² with a shared pool, for a warm climate; Hotel 3 — 10 rooms on 322.8 m² with a reception, a dining hall, and a kitchen on the ground floor; and Hotel 2 — 8 rooms on 360 m² with spacious bathrooms and balconies. The room layout, the number of rooms, and the facade can change at the design stage.

Specification and options

The structure is built on a G550 steel frame with 9 mm OSB board, mineral wool, and aluminium windows with triple Low-E glazing. A northern package — reinforced insulation and heat pumps for operation at low temperatures — and a furniture package for the rooms and common areas (furniture catalog) are available as options. The exact contents are fixed in the specification attached to the contract.

Climate solutions

Insulation, glazing, and heating capacity are matched to the site's climate: the factory's engineers do the thermal calculation together with our technical team. A northern package is available for operation in cold regions.

Logistics and scope of responsibility

The finished property is inspected at the factory and loaded into containers. A partner logistics company organizes delivery (more on delivery), and the client's contractor handles on-site assembly. We run the project, control production, and provide assembly documentation and technical support.

Government support

A support program exists for modular accommodation projects; one of its requirements is a room area of at least 16 m². The current terms are on the subsidies for modular hotels page; the investor, not TF Module, files the application.

TF Module modular hotels: project comparison
ProjectRoomsAreaRoomFactory price fromClimate
Hotel One10240 m²≈18 m²from $129,600Warm climate
Hotel 28360 m²≈28 m²from $336,600Russian climate, year-round operation
Hotel 310322.8 m²≈32 m²from $301,818Russian climate, optionally down to −35 °C

Prices are "from" figures — the factory price excluding delivery and assembly; the final cost is calculated per project. How cost is formed is covered in how much a modular home costs.

Planning a hotel? Tell us about the format and the region — we'll prepare the project and estimate the timeline.

Catalog

Hospitality Properties

Examples of modular hotels — from compact resort rooms to larger hotel complexes.

TF Hotel One — facade with pool240 m²

Hotel One

A two-storey modular hotel with 10 rooms around a shared pool and terraces — compact en-suite rooms for a resort or investment project in a warm climate.

10 rooms≈18 m² / room2 floors

from $129,600

TF Hotel 2 — facade with pool360 m²

Hotel 2

A two-storey modular hotel with 8 rooms, spacious en-suite bathrooms, and balconies — generously sized rooms built for year-round operation, including cold-climate regions.

8 rooms≈28 m² / room2 floors

from $336,600

TF Hotel 3 — forest-set facade322.8 m²

Hotel 3

A two-storey modular hotel complex with 10 rooms plus a reception, dining hall, and kitchen on the ground floor. An optional northern package for operation down to −35 °C and an optional furniture package for the rooms and common areas are both available.

10 rooms≈32 m² / room2 floors

from $301,818

The government co-finances up to 50% of a modular hotel or glamping site

We break down who can qualify for support and how a TF Module project fits into it.

More about government subsidies →

Frequently asked questions about modular hotels

How much does a modular hotel cost?

Factory prices for our projects: Hotel One (10 rooms, 240 m²) from $129,600, Hotel 3 (10 rooms, 322.8 m²) from $301,818, and Hotel 2 (8 rooms, 360 m²) from $336,600. The price excludes delivery and assembly and is refined for the climate, specification, and region.

How long does it take to produce a modular hotel?

Design takes 2–3 weeks, production of a complex takes up to 45 days, and pre-shipment preparation takes up to 30 days. Delivery is calculated separately for the route.

Can I order several buildings for a hotel complex?

Yes, it is one of our main directions. Such projects benefit from factory production through the repetition of identical modules and predictable commissioning timelines.

Is a modular hotel suitable for a cold climate?

Yes, if the climate is built into the project. A northern package — reinforced insulation and heat pumps — is available for operation at low temperatures; the final parameters come from the thermal calculation.

Who is responsible for assembling the hotel on site?

Assembly is not part of TF Module's offer: the client's contractor does it using our documentation. For a complex project we can send a factory engineer to supervise assembly.

Can the room layout be changed?

Yes. The number and area of rooms, the facade, and the specification are defined at the design stage; the limits are set by the structural scheme and the modules' transport dimensions.