What falls within TF Module's scope
We develop the project, prepare the technical brief, select the production site, support manufacturing, control quality at every stage, and inspect the finished home before it ships in a container. Our scope of responsibility ends there.
Delivery stages
First, our specialists inspect the finished home at the factory and load it into a container. A partner logistics company then takes it along the route. After arrival on site, the client's contractor handles assembly. Pre-shipment preparation before dispatch takes up to 30 days.
Timelines and cost
Delivery time and cost depend on the region and the delivery method, so they are calculated separately for each project and are not part of the factory price. As a production reference: a private home up to 150 m² takes 25–30 days and a complex takes up to 45 days; see also how long it takes to build a modular home.
Module dimensions
Transport is limited by container dimensions and road regulations, so the size of a single module is limited. The home's total area is set by the project: the property is assembled from as many modules as needed. Foldable modules (TF E02, TF E01, TF E03) ship folded and open up on site.
Site preparation and connection
The internal building systems are installed at the factory and the connection points are brought out — on site, they only need to be connected to external utilities. We advise on preparation and provide technical documentation so that the site is ready to receive the property.
Assembly on site
Assembly is not part of TF Module's offer: the client's contractor handles it — a private home in 3–7 days and a complex in 14–35 days. We provide assembly documentation and technical support, and for a complex project we can send a factory engineer to supervise assembly.
Need a delivery estimate for your region? Tell us about the site and the property — we'll prepare an estimate and timelines.