TF ModuleTF MODULE
RU

Production

Modular Home Production and Quality Control

How modular home manufacturing is organized: choosing a factory, the technical brief, control at every stage, and inspection before shipping.

A factory hall producing modular buildings, with finished blocks at different stagesProduction

How we work with factories

We work with several specialized factories in China: each has its own strong technologies — steel frames, timber, panel systems, large-format modules. A separate pool of manufacturers is assembled for every project, and the contract is signed directly with the factory. Read more about the process on the modular homes from China page.

From brief to production

A project starts with your brief, not with a catalog: we prepare the technical brief for the site, climate, and purpose of the property. Design takes 2–3 weeks; the factory's engineers do the thermal calculation together with our technical team, and the region's wind and snow loads are built into the structural calculation.

Control at every stage

Manufacturing follows the approved design documentation, and control runs at every key stage before shipping. The vapour-barrier envelope is assembled at the factory in stable conditions, without rain or humidity swings, and checked before shipping; ventilation is built into the project.

Inspection before shipping

Our specialists inspect the finished home before it leaves for the client, after which the property is loaded into a container. TF Module's scope ends there: a partner logistics company organizes delivery (more), and the client's contractor handles assembly.

Production timelines

Production of a private home up to 150 m² takes 25–30 days, and a complex or community takes up to 45 days; pre-shipment preparation takes up to 30 days. This is a factory process: precision and predictability are higher than with assembly on an open site.

Documents

The contents of the specification are fixed in the specification attached to the contract. Together with the property, the client receives technical and assembly documentation and the operating instructions; warranty terms are fixed in the contract.

Want to know how your project will be produced? Tell us about the brief — we'll match production and estimate the timeline.

Frequently asked questions about production

Do you manufacture the homes yourselves?

We work with several specialized factories in China and select production for the specific project. We prepare the technical brief, support manufacturing, and inspect the finished home before shipping.

How is quality controlled?

Control runs at every key stage before shipping: against the approved design documentation, with a check of the vapour-barrier envelope and an inspection of the finished home by our specialists before dispatch.

How long does production take?

A private home up to 150 m² takes 25–30 days, a complex or community takes up to 45 days, and pre-shipment preparation takes up to 30 days. Design takes another 2–3 weeks.

Why is factory production more reliable than site assembly?

The envelope is assembled in stable conditions, without rain or humidity swings, and checked before shipping. This reduces the risk of condensation and mould caused by breaks in the vapour barrier.