Asia · villas and hotels
Factory-Built Villas and Hotels for Thailand, Bali and Malaysia
We design, produce, and supply prefabricated modular villas and houses. Most of the work is done at the factory, so timelines are shorter and the budget and quality are more predictable than on a conventional site build. It suits a private villa, a rental villa, a boutique hotel, or a development of several villas.
- 15–20
- villas per month — factory capacity
- up to 45 days
- production
- up to 25 days
- assembly on site

How it works
Three steps instead of a long build on site.
- 01
Production
Structural elements and components are made at the factory.
- 02
Kitting
Finished modules and components are packed as one kit and shipped to the site.
- 03
Assembly
Installation and assembly are carried out on site.
Most of the construction is done at the factory: shorter timelines, a lower budget, better quality.
What TF Module is responsible for
- project design
- technical coordination
- production control
- inspection of the kit before shipment
Any architectural style: from contemporary minimalism to bespoke designs based on your sketch.
Timeline
A conventional villa build takes 8–18 months. Here the villa is manufactured while the site is being prepared.
Production
up to 45 days
Assembly
up to 25 days
Rainy season. Concrete is needed only for the foundation. Walls and roof are assembled from finished elements, so rain does not affect the schedule.
A steel frame built for the tropics
Galvanised G550 profiles, corrosion protection class C4.
- Lightweight. A lighter foundation is enough.
- Large spans. Panoramic windows and open-plan layouts.
- Stable geometry. Steel does not rot or shrink, and termites cannot damage it.
- Coastal sites. C4 protection is designed for humid seaside conditions.
- Service life. The design service life of the frame is over 50 years.
What the house is made of
- Frame
- G550 steel profiles, hot-dip galvanised.
- Walls
- Rock wool, OSB, cement panels outside, bamboo-fibre panels inside. Ventilated cavity with drainage.
- Roof
- Rock wool, OSB, SBS membrane, aluminium-magnesium-manganese sheet.
- Windows
- 5+9A+5 double glazing, tempered glass, wind resistance class 6–7. Low-E on request.
- Floor
- 18 mm fibre cement board, SPC flooring.
- Utilities
- Copper wiring, distribution board, LED lighting, water supply, sewerage, sanitary fittings. Wiring and pipework are laid at the factory to the project design.
The structure is engineered for the local climate and the specification can be adapted to the project. The final scope is fixed in the specification.
Price
Average price per m²
2,100 CNY
EXW China
- Villa 90 m², 2.8 m ceilings190,900 CNY
- Villa 102 m², 3.0 m ceilings212,594 CNY
- Terrace for the 102 m² villa9,522 CNY
- Air conditioning, water heater and kitchen for the 90 m² villa10,534 CNY
Excluding taxes, shipping, and assembly. The price is fixed in the specification before production starts. For developments, the price per villa is calculated by quantity.
What the price covers
Included
- Steel frame and all house materials per specification
- Electrics, water supply, sewerage, sanitary fittings
- Production control and inspection before shipment
On request
- Air conditioners, water heater, kitchen, terrace
- Low-E glass, thicker insulation
- Higher factory readiness: sections with insulation and panels installed
- Engineer from China to supervise assembly — USD 150 per day, plus flights, accommodation and meals
Paid separately
- Shipping, handled by a partner logistics company. For reference: a 102 m² villa fits in one 40HQ container, shipping to Songkhla port from USD 2,265
- Customs and taxes in the destination country
- Foundation, assembly, utility connections
- Pool, landscaping, permits
On-site assembly is carried out by the client's contractor using TF Module's documentation.
Timeline, payment, quality control
- First villa, after drawings are approved45 days
- Each following villa30 days
- Series output15–20 villas per month
- Assembly, crew of 4–5up to 25 days
50%
before production starts
50%
before shipment
The quotation is valid for 30 days.
Quality control and claims
Our specialist supervises production, sends photo and video reports, and inspects the kit before shipment.
If a defect is the factory's fault, the factory covers materials, shipping, and replacement. Claims are answered within 24 hours.
Ready-made designs
The designs are fully costed. They can be taken as a base and adapted to your plot.

Villa 92
2 bedrooms, 2 bathrooms, house footprint 12 × 7.76 m.
from 190,900 CNY
Details →
Villa 120
3 bedrooms, 3 bathrooms, 42 m² terrace. Hipped roof and a covered terrace.
from 252,000 CNY
Details →
Two-storey villa
For narrow plots. Living room and kitchen with pool access downstairs, two bedrooms with balconies upstairs. 2 bedrooms, 3 bathrooms including a guest one.
from 220,000 CNY
Prices are EXW China.
Two-storey villa: layout and interiors
A compact plot, a pool, a garage, and two floors. Below are the axonometric view, the floor plans, and the interiors.








Images are project visualisations.
Hotels built the same way
Guest rooms, reception, restaurant, service buildings. The factory produces rooms of one type in series: same size, finish and fittings.
- 8-room hotel2 floors, 28 m² room with en-suite, 7.5 × 24 m360 m²
- 10-room hotel2 floors, 18 m² room with en-suite, 6 × 20 m240 m²
The price is calculated for each project.


Furniture, lighting and decor to your interior design
We source furniture, lighting, fittings, sanitary ware, appliances, textiles and decor. For hotels: branded towels, bathrobes, tableware and signage with the resort's name.
Everything is purchased under one specification and arrives in the same containers as the house.
Furnishing catalog →Getting started
Send us:
- — location
- — plot size
- — villa size
- — number of bedrooms
- — number of villas
- — finish level
- — budget
- — references
We will send you a preliminary layout and cost estimate. If you don't have a plot yet, we'll start with the format and budget.