TF ModuleTF MODULE
RU
TF Hotel 2 — facade with pool

Hotel Complex

Hotel 2 Modular Hotel

A two-storey modular hotel with 8 rooms, spacious en-suite bathrooms, and balconies — generously sized rooms built for year-round operation, including cold-climate regions.

360 m²8 rooms≈28 m² / room2 floors

Price

from $336,600

Factory price, excluding delivery and installation. Final cost is calculated per project.

TF Hotel 2 — facade with pool
TF Hotel 2 — room with a balcony
TF Hotel 2 — room balcony
TF Hotel 2 — room bathroom

Floor Plan

Hotel 2 — floor plan
  • Total Area360 m²
  • Rooms8
  • Room Size≈28 m² / room
  • Floors2

Specifications

Advantages

  • 8 rooms of ≈28 m² each with a spacious 4 m² en-suite bathroom and a private balcony
  • Built for year-round operation, including a northern climate package
  • Modular construction — fast on-site assembly of the building
  • A ready-made solution for hospitality business and investment projects

Materials & Finishes

  • Thermo-treated woodfacade
  • Metalbalcony railings
  • Stone-look texturebase cladding

Leave a Request

Tell us about your brief — we'll calculate the cost and production timeline.

Questions about Hotel 2

How much does Hotel 2 cost?

The factory price is from $336,600. It excludes delivery and assembly; the final figure is calculated for the region, climate, and specification.

How many rooms does Hotel 2 have, and how large are they?

The project has 8 rooms of about 28 m² each, a total area of 360 m², and 2 floors. The number and layout of the rooms can change at the design stage.

How long does Hotel 2 take to produce and who assembles it?

Design takes 2–3 weeks, production of a complex takes up to 45 days, and pre-shipment preparation takes up to 30 days. A partner logistics company organizes delivery, and the client's contractor handles on-site assembly using our documentation.