TF ModuleTF MODULE
RU
TF Hotel 3 — forest-set facade

Premium Hotel Complex

Hotel 3 Modular Hotel

A two-storey modular hotel complex with 10 rooms plus a reception, dining hall, and kitchen on the ground floor. An optional northern package for operation down to −35 °C and an optional furniture package for the rooms and common areas are both available.

322.8 m²10 rooms≈32 m² / room2 floors

Price

from $301,818

Factory price, excluding delivery and installation. Final cost is calculated per project.

TF Hotel 3 — forest-set facade
TF Hotel 3 — guest room
TF Hotel 3 — room bathroom
TF Hotel 3 — room balcony
TF Hotel 3 — corridor
TF Hotel 3 — breakfast area
TF Hotel 3 — staircase and lobby

Floor Plan

Hotel 3 — floor plan
  • Total Area322.8 m²
  • Rooms10
  • Room Size≈32 m² / room
  • Floors2

Specifications

Advantages

  • 10 rooms with a private bathroom each — capacity for up to 20 guests
  • A reception, dining hall, and kitchen on the ground floor — ready-made infrastructure for a hotel operator
  • An optional northern package — reinforced insulation and heat pumps for operation down to −35 °C
  • An optional furniture package — beds, wardrobes, sofas, a kitchen set, and appliances for the rooms and common areas
  • Up to 90% factory-completed construction — minimal on-site work
  • 45–55 days of factory production, 10–15 days of on-site assembly

Materials & Finishes

  • Steel frameG550, 9mm OSB board
  • Mineral woolfloor, wall, and roof insulation
  • Metal panelsexterior facade cladding
  • Aluminium windowstriple Low-E glazing with argon fill

Leave a Request

Tell us about your brief — we'll calculate the cost and production timeline.

Questions about Hotel 3

How much does Hotel 3 cost?

The factory price is from $301,818. It excludes delivery and assembly; the final figure is calculated for the region, climate, and specification.

How many rooms does Hotel 3 have, and how large are they?

The project has 10 rooms of about 32 m² each, a total area of 322.8 m², and 2 floors. The number and layout of the rooms can change at the design stage.

How long does Hotel 3 take to produce and who assembles it?

Design takes 2–3 weeks, production of a complex takes up to 45 days, and pre-shipment preparation takes up to 30 days. A partner logistics company organizes delivery, and the client's contractor handles on-site assembly using our documentation.