TF ModuleTF MODULE
RU
TF Villa 120 — facade with covered terrace and pool

Hotel Villa

Villa 120 Modular Villa

A single-storey villa in a Thai style for hospitality business and premium rental — three bedrooms, three bathrooms, and an open kitchen-living room opening onto a deck and a private pool. Sized for 6 guests, it suits both personal use and rental.

120 m²3 bedrooms3 bathrooms18 m² pool42 m² terrace

Price

from $162,000

Factory price, excluding delivery and installation. Final cost is calculated per project.

TF Villa 120 — facade with covered terrace and pool
TF Villa 120 — pool, angled view
TF Villa 120 — living room and kitchen
TF Villa 120 — bedroom with pool view
TF Villa 120 — bathroom
TF Villa 120 — kitchen and dining area

Floor Plan

Villa 120 — floor plan

Footprint: 13.4 × 18.7 m, height 3.2 m. A pool-side deck terrace.

Specifications

Advantages

  • Three bedrooms and three bathrooms — sleeps up to 6 guests
  • An open kitchen-living room with dining for six
  • An 18 m² private pool and a 42 m² deck running the length of the home
  • A master bedroom with an en-suite bathroom and pool access
  • Turnkey-ready for hospitality business
  • Modular construction with premium finishing materials

Materials & Finishes

  • Renderwarm white, facade
  • Dark wood-look texturebeams, carved panels
  • Ceramic tileroofing
  • Stone-look texturecountertops

Leave a Request

Tell us about your brief — we'll calculate the cost and production timeline.

Other Villas

Questions about Villa 120

How much does Villa 120 cost?

The factory price is from $162,000. It excludes delivery and assembly; the final figure is calculated for the site, climate, and specification.

Which climate does Villa 120 suit?

TF Module villas are designed for warm climates. If the site is in another region, insulation, glazing, and climate-control systems are calculated for it separately.

How long does Villa 120 take to produce and who assembles it?

Design takes 2–3 weeks and production of a private property up to 150 m² takes 25–30 days. A partner logistics company organizes delivery, and the client's contractor handles on-site assembly using our documentation.